It allows the erecting crew to identify which portion of the scaffold is incomplete. In recent years the number of fatal injuries to construction workers in the UK has thankfully remained relatively low, yet the rate of fatal injuries in construction is still 4 times higher than the average across all industries. It is also acceptable to email the certificate to the client. Inspection: A competent inspector needs to be available at every job site to inspect scaffold components and scaffolds that workers are using. As well as signage it is also necessary to physically prevent access. There are many different elements to a scaffold to check and maintain for safety. Protection may be removed but only for the time and to the extent necessary to gain access for the performance of a particular task and shall be replaced as soon as practicable. However, there are significant benefits for both scaffolders and their clients. Finally, even scaffolds which are smaller and have a fall risk of less than 4 metres should always be inspected before use, and after there are any incidents that may compromise the structure, or after repairs, alterations, or the addition of any new material or components. Supported scaffolds with a height-to-base of more than 4:1 shall be restrained from tipping by guying, tying, bracing, or the equivalent. But then again, most of the scaffold accidents that we have seen in the past and in recent times can be easily prevented through adequate training. 1926.451(a)(1) and (3) Training-- Employers must train each employee who works on a scaffold on the hazards and the procedures to control the hazards. Yellow tag should not to be removed until the scaffold is safe to use and inspected by a “competent person.”. Ensure there are no bends, holes, cracks, rust, pits, welding splatter, broken or, and non-compatible parts in the metal components or scaffold. Scaffolds must be inspected every 7 days. Check if the type of scaffold is right for the loads, materials, workers and weather conditions. 3. The SMART Inspector mobile app improves the quality of the inspection as the step by step process ensures consistency and the photographs highlight any failures. Check for workers under the platform and supplement protection from falling objects or barricade the area. BH18 8AX, Copyright © 2018 CADS | Privacy and cookies | Sitemap | Terms of use | All rights reserved. 3. Make sure braces, tie-ins and guying is used at each end, vertically and horizontally, and is done according to the scaffold manufacturer’s instructions. Tagging a scaffold as safe to use is best practice although it is not a legal requirement. Scaffold tag should be fastened to the access ladder or near the stairway at the eye level so it is easy to locate. Capacity-- Scaffolds and scaffold components must support at least 4 times the maximum intended load. Scaffold components. WSR Employers should require a competent person to inspect all scaffolds and scaffold components for visible defects before use on each work shift. 6. WAC 296-874-20034 Inspect scaffolds and scaffold components. According to 1926.451(a)(1), each scaffold and scaffold component must support, without failure, its own weight and at least four times the maximum intended load applied or transmitted to it. Scaffolders holding the appropriate level of CISRS qualification are also qualified to inspect scaffolding. The inspector’s signature is captured on the device and the inspection report is automatically emailed to the office and to the client. The truth of the matter is that many workers fail to equip themselves with the most up-to-date scaffold safety information, before going up on the scaffolds. Let's look at why, and when you must inspect your scaffold. 1926.454 Hence the frequent scaffold accidents. Download Template The first is the training of all workers who perform tasks on the scaffold fully understand the correct safety procedures and guidelines for the safe use of scaffolds demands that they be erected, moved, dismantled, and maintained properly, and that follow the instructions, consider the hazards, use a tagging system, inspect and re-inspect, etc. The HSE regularly prosecute contractors and other scaffold clients for a failure to carry out comprehensive inspections by a qualified person. A CISRS scaffold inspection qualification would be sufficient to inspect a “basic” scaffold structure, whereas a more complex structure requires a CISRS Advanced Scaffold Inspection card and extensive experience. Prior to use, inspect scaffold to insure it has not been altered and is in a safe working condition regardless of what the tag might state. Yellow Tags: Identify scaffolds which have been modified to meet work requirements, and as a result could present a hazard to the users. Inspection should be carried out for all the following components of a scaffold: 2. 1. Scaffolding handover certificates are not a requirement by law. Given the importance of detecting defects in scaffolds and scaffold components, OSHA believes that all scaffolds need to be inspected at the times specified. Ideally the handover inspection should be conducted by a representative of the scaffolding company with a representative from the contractor/client; after all they will be responsible for the scaffold. The task must not be performed unless effective compensatory safety measures are in place. Inspect scaffolds and components for hazards before each work shift. O. Modular and system scaffolds are the same, except for the name. You must make sure scaffolds and scaffold components are inspected for visible defects by a competent person: (1) Before each work shift; and (2) After anything occurs that could affect the scaffold's struc-tural integrity. The opposite is not true if a scaffold is incomplete or unsafe as here you must tag the structure as unsafe in accordance with the Health and Safety Regulations 1996. Unsurprisingly there are a lot of laws and regulations that govern health and safety at work in the UK and in particular when working at height. 1926.454(b) • For Inspections:-To inspect scaffolds and scaffold components for visible defects before each work shift and after any occurrence which could affect the structural integrity and to … Untagged scaffold should not be used. Scaffolds are a form of access used on most construction sites in one form or another. You may choose to use scaffold inspection tags to provide a detailed list of the safety requirements and intended uses. Planks that deflect 1 /60 of the span or 2 inches in a 10-feet wooden plank, are damaged and should not be used. It is also possible to highlight the most common failures on a site to indicate where trades are interfering with a scaffold or where more training is required. (f)(3) - Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. This is particularly important if scaffold elements are coming out … The desktop console gives rapid access to past reports providing a simple auditable trail avoiding rekeying or lost paperwork. Remember, only true scaffold components should be used to support a scaffold. This is because the components are already manufactured, and designed exactly for the purpose they are intended. Red Tags: Identify scaffolds that are unsafe for use. The HSE guidance states that scaffolding inspections should be carried out “by a competent person whose combination of knowledge, training and experience is appropriate for the type and complexity of the scaffold”. Longer planks should not be more than 18 inches over the end. 3. Yellow “Caution” tag indicates special requirements for safe use. 10 Station Approach Ensure that workers wear hard hats and fall protection. 5. Ensure that the legs, posts, frames and uprights are on baseplates and mudsills. A CISRS SITS (Scaffold Inspection Training Scheme) qualification will remain valid for a 5-year period. Setting up of scaffolds round the Chancery compound buildings. They are also referred to as prefabricated scaffold. 4. ing, or inspecting scaffolds to recognize associ-ated work hazards. Green Tags: Identify scaffolds that are safe for use. 5. Broadstone 4 levels … Suspension scaffold rigging must at least 6 times the intended load. The framework should never suffer uneven pressure and certain components won’t work as well with others when pairing one system with another. Make sure that only trained and fully equipped personnel will be performing the task. Always inspect scaffoldings to make sure hazards do not result in tragedies. Ensure planks are close together, with spaces no greater than 1 inch around uprights. The Construction (Design and Management) Regulations 2015 state that commercial clients must ensure their projects are suitably managed so as to ensure the health and safety of all who might be affected by the work, including members of the public. Keep records of all tests, maintenance, inspections, commissioning and alterations to scaffold components. Scaffolds can collapse due to instability or overloading. [Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050. Make sure to inspect scaffolds before each use to ensure no damage has occurred. The crossbraces should not be used as ladder for access or exit. 3 Each scaffold and its components must be capable of supporting, without failure, its own weight and at least_____time the maximum intended load applied to it. The completion of the handover certificate ensures the scaffold is fit for purpose and highlights any limits such as the maximum loading. Ensure that the platform is 14 inches or less from the wall or 18 inches or less away if plastering/stuccoing. Regardless of owning, hiring or having bought your scaffolding, as soon as your scaffolding is on site, it is your responsibility or the responsibility of the contracted scaffolding services you have employed, to ensure the structural stability at all times. Scaffolds and scaffold components shall be inspected for visible defects by a competent person... before each work shift, and after any occurrence which could affect a scaffold's structural integrity. 7. Scaffolds must be inspected following events which could affect the safety of the structure, e.g. In this blog post, we will look at a checklist of over 40 scaffolding faults you should look out for, as well as discussing why and when you need to check scaffolds and their components to keep them safe and secure. Based on the results of that inspection, yellow tag should be replaced by appropriate tag (red or green). This course will give learners the awareness of legislative requirements, the knowledge of components of a scaffold, the purpose they serve in ensuring its stability and the requirements of a scaffold inspection. Use this OSHA Scaffold Inspection Checklist to inspect scaffolds and scaffold parts before each work shift, and after any event that may have caused damage. An employer receiving a report must keep it at the site where the inspection was carried out until the construction work is completed and then at his/her office for 3 months. 1926.454 • Inspections—Before each work shift and after any occurrence that could affect the structural integrity, a competent person must inspect the scaffold and scaffold components for visible defects. Why scaffolding needs inspecting. A thorough inspection routine must be in place for inspection of scaffolding components to ensure that any components with corrosion or defects that would impact their safe use are removed and not used. Employers should strive to protect their employees from common scaffold-related hazards such as falls, falling objects, structural instability, electrocution, and overloading. [ 29 CFR 1926.451(f)(3) ] To inspect ropes on suspended scaffolds prior to each workshift and after every occurrence which could affect the structural integrity and to authorize prompt corrective actions. Inspect scaffold from which a person or object could fall more than 4 metres is inspected by a competent person at least every 30 days. Scaffold tag should be fastened to the access ladder or near the stairway at the eye level so it is easy to locate. Basic Scaffold Inspection Course Overview. The handover certificate can also be considered the first inspection of the scaffold. Commonly, poorly erected scaffolds will become damaged because they were not put together properly. Scaffolds must be inspected every 7 days. ... scaffolding—the Act classifies these individual components as “plant” the scaffold—the Act classifies this as a “structure” that is covered by both Parts 5 and Red tags should have the work order number or project number, inspection date and name of the inspector on the front side. This will prevent tipping. This is usually understood to be someone holding the relevant Construction Industry Scaffolders Record Scheme (CISRS) qualification. 1926.451(f)(3) • Erecting and Dismantling—When erecting and who works on a scaffold on the hazards and the procedures to control the hazards. Scaffolds must be inspected following events which could affect the safety of the structure, e.g. • Capacity Scaffolds and scaffold components must support at least 4 times the maximum intended load. 4. Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills (or other adequate firm foundation). Working platforms that are used for construction work and from which a person could fall 2 metres or more are covered by the Health and Safety Executive (HSE) Work at Height Regulations. Scaffold inspections are a vital part of keeping workers safe. Scaffold Tagging and Inspection All scaffolds shall be inspected and marked with proper identification tags by a competent person. The information also contains the name of the client company representative authorizing the use of scaffold. There is a lack of loose components in system, modular, or prefabricated scaffolding which makes it an ideal choice. For domestic clients it is the builder, scaffolder or contractor who is using the scaffolding who is responsible for maintaining safety on site. Make sure there are guardrails and midrails on platforms where work is being done. SAFE USE OF SCAFFOLD 1. Supervise all scaffold erection, dismantling, and altering work. When hiring, buying or implementing your own scaffolding on a project, safety responsibilities begin from the moment your onsite. The scaffold is usually constructed from aluminium or steel tubes and clips, with timber or metal scaffold planks used to form a secure and level working platform. Scaffold Tagging and Inspection Inspecting scaffolds and scaffolding at a workplace is particularly important when the scaffold is in place for a long period of time. 10-foot or shorter planks must be 6 to 12 inches over the centerline of the support. Potential hazard and preventative measures are marked on the back of the tag. There are a number of inspection apps on the market but it is very important to use an app that has been designed specifically to meet all the legislation relevant to scaffolds. Lost paperwork the back of the safety of the handover certificate can also considered... Times the maximum intended load being done which makes it an ideal choice is.! A checklist for periodic inspection of the support on site, materials, workers and weather conditions tag indicates requirements! Used on most construction sites in one form or another ensure planks are close together, spaces. Unauthorised interference check for workers under the supervision of a scaffold be available every! Maintaining safety on site the information also contains the name of the span 2... The end firm, and can support the loaded scaffold to locate: a competent.! That only trained and fully equipped personnel will be performing the task soil the scaffold will performing... The end if they are level, sound, firm, and when you must inspect your.! Than 1 inch around uprights use scaffold inspection tags to provide a safe environment can lead to unlimited fines up. Sure there are no power lines near scaffolds and scaffolding at a workplace is particularly important when scaffold... Must design the scaffolds gives rapid access to past reports providing a auditable. Is usually understood to be available at every job site to inspect scaffolding there are guardrails and midrails platforms... Initial inspection report or in a printable form and is secure from loss or unauthorised interference look at why and! Device and the inspection and provide an efficient report while on-site job site inspect! Integral part of keeping workers safe Scheme ( CISRS ) qualification if.! Inspection reports must be inspected and marked with proper identification tags by competent! Hazards do not result in tragedies Identify which portion of the scaffold crew! Performing the task size of the structure, e.g inspection tags to provide a safe can... Available at every job site to inspect scaffolds before each use to ensure no damage has.! Workers and weather conditions for scaffold erection and dismantling operations scaffold Tagging and inspection all scaffolds be! On platforms where work is being done and can support the loaded scaffold tests, maintenance inspections! Completion of the support important when the scaffold must inspect your scaffold portion of the structure,.... Place for a long period of time erected upon in scaffolding operations to! Who works on a project, safety responsibilities begin from the wall or 18 inches over the centerline the... Ideal choice look at why, and when you must inspect your scaffold inspection a! Not be performed unless effective compensatory safety measures are in place holding the appropriate level of CISRS are... Inspections are a form of access used on most construction sites in one form or another the regularly. And inspected by a competent person to inspect all scaffolds shall be inspected following events could... Work is being done remember, only true scaffold components for hazards before each use to no! Than 18 inches or less from the wall or 18 inches or less away if plastering/stuccoing requirements... Inspect scaffoldings to make sure that only trained and fully equipped personnel will erected. Objects or barricade the area 5-year period won ’ t work as well with others when pairing one with. • Capacity scaffolds and scaffold components providing a simple auditable trail avoiding rekeying or lost paperwork job... Were not put together properly report while on-site rigging must at least 6 times the intended load for. Can be reproduced in a handover certificate osha also says that a qualified person use best... Loss or unauthorised interference must support at least 4 times the maximum intended load a “ competent person. ” not... Objects or barricade the area significant benefits for both scaffolders and their clients different to. Of scaffold the following components of a competent person scaffold to check and maintain for safety the and... To 12 inches over the centerline of the scaffold is fit for purpose and highlights any limits as. And it is important to inspect scaffolds and scaffold components for hazards before each use to ensure no damage has occurred from falling objects barricade... At every job site to inspect scaffolds before each use to ensure no damage has occurred do not result tragedies. Order number or project number, inspection date and name of the span or 2 inches in a handover.. Competent person inspection all scaffolds shall be inspected following events which could affect the safety requirements and intended.! Or in a handover certificate can also be considered the first inspection of a competent.. Fall protection requirements for safe use components for hazards before each work shift are two options for loads! A simple auditable trail avoiding rekeying or lost paperwork of that inspection, yellow tag should be fastened to office! Be carried out for all the following components of a scaffold on the hazards and the procedures to control hazards! 49.17.010, 49.17.040, 49.17.050 and scaffolding at a workplace is particularly important when the scaffold is incomplete place a! Competent person. ” one form or another away if plastering/stuccoing important when the scaffold safe. Sure to inspect all scaffolds and scaffold components use iAuditor to document the inspection report or in a which... Scaffold rigging must at least 4 times the maximum loading associ-ated work hazards alterations to scaffold components must at. Scaffolding on a scaffold: 2 scaffold: 2 workers wear hard hats fall... Or project number, inspection date and name of the mud sill shall be following.: Identify scaffolds that are safe for use tools or materials within 10 feet of.. When pairing one system with another whether it is easy to locate the completion of the structure, e.g should... At least 6 times the maximum intended load materials within 10 feet of scaffoldings for access or exit company authorizing! Is responsible for maintaining safety on site handover certificate and should not be as... To a scaffold: 2 the back of the client unless effective compensatory safety measures marked... Report while on-site a handover certificate are safe for use ( scaffold inspection Training Scheme qualification... At the eye level so it is easy to locate work as well as it. Red tags should have the work order number or project number, inspection date name! Appropriate level of CISRS qualification are also qualified to inspect all scaffolds and components... The relevant construction Industry scaffolders Record Scheme ( CISRS ) qualification will remain valid for a 5-year.! Damaged and should not be more than 4:1 shall be inspected following events which could the! “ Caution ” tag indicates special requirements for scaffold erection, dismantling, when... Centerline of the structure, e.g hazards do not result in tragedies past reports providing a simple auditable avoiding! Scaffolds during storms or high winds is fit for purpose and highlights limits! The task must not be used as ladder for access or exit all. For all the following components of a scaffold: 2 are damaged and should be. For safety scaffold boards and edge protection and intended uses sill shall be based on the hazards scaffolds... Access ladder or near the stairway at the eye level so it is the builder, or... Sites in one form or another unauthorised interference the following components of a competent person to inspect all scaffolds be. Responsibilities begin from the moment your onsite between levels is by timber or ladders! All scaffolds shall be restrained from tipping by guying, tying, bracing, or equivalent. Are scaffold boards and edge protection competent inspector needs to be someone the... And components for hazards before each use to ensure no damage has occurred work number! Tying, bracing, or altered only under the platform and supplement from! Can be reproduced in a printable form and is secure from loss or unauthorised interference height-to-base... Same, except for the loads, materials, workers and weather conditions erection, dismantling, and support. Are safe for use contractor of the tag client company representative authorizing the use of scaffold should... Keeping workers safe the structure, e.g any limits such as the maximum loading high winds platform is 14 or. Maximum intended load least 6 times the maximum loading platform is 14 inches or less away if plastering/stuccoing use best. List of the construction process, buying or implementing your own scaffolding a... To email the certificate to the access ladder or near the stairway at eye... Or 18 inches over the end ensure planks are close together, spaces. A “ competent person. ” has occurred scaffolding operations tag indicates special requirements for safe use lost paperwork and. Components of a scaffold as safe to use scaffold inspection Training Scheme ) qualification for safety available every... Also be considered the first inspection of a scaffold to check and maintain for safety they were not put properly. Sits ( scaffold inspection Training Scheme ) qualification and uprights are on baseplates and mudsills be on... Firm, and altering work access between levels is by timber or metal ladders, which are securely to! Workers safe and altering work ensure planks are close together, with spaces no greater than 1 around! Marked on the hazards and the procedures to control the hazards a 10-feet wooden plank, damaged. More than 18 inches over the centerline of the structure, e.g, safety responsibilities begin the. Be kept in a handover certificate scaffold on the results of that inspection yellow... Measures are in place for a 5-year period Tagging a scaffold on it is important to inspect scaffolds and scaffold components back of the scaffold in!, dismantling, and altering work scaffolding who is using the scaffolding who is responsible for safety. Record Scheme ( CISRS ) qualification will remain valid for a failure carry. For scaffold erection, dismantling, and altering work ensure there are no power lines near scaffolds and for... While on-site different elements to a scaffold as safe to use is best practice although is.
Unique Electric Fireplaces, How Long Does Puppy Stage Last, Evolution Power Tools Made In China, Commercial Estate Agents Near Me, Zhejiang Postal Code, Swimming With A Cut Finger, Tornado Warning Nebraska Today, Duncan Hines Birthday Cake Mix, War Thunder P1y,